TechNote # |
Description |
Author |
Date |
Documentation Table of Contents |
- |
- |
|
Tertiary Mirror Size |
- |
- |
|
Coordinate Systems for the K1DM3 Project |
Prochaska Phillips Adkins |
15DEC13 |
|
Finite Element Analysis for the Mirror Mounts for the K1DM3 Project |
Cabak Nelson Prochaska |
30JAN14 |
|
Positioning of M3 for the K1DM3 Project |
Prochaska Adkins Nelson Phillips |
25AUG14 |
|
Mirror Specifications for the K1DM3 Project |
Prochaska Nelson Epps Hilliard Phillips Adkins |
2SEP14 |
|
Tertiary Kinematic Mounts |
Nelson |
21SEP14 |
|
Damper Concept and Trade Discussion |
Prochaska Ratliff Cowley Cabak Nelson |
19DEC14 |
|
Random Vibration Analysis |
Prochaska Cabak Nelson |
29JAN15 |
|
Prototype for the K1DM3 Project |
Prochaska Ratliff Cowley Adkins Cabak |
9MAR15 |
|
Zygo Quote for the K1DM3 Mirror |
Prochaska Cabak Ratliff Cowley Phillips Nelson Adkins |
16SEP15 |
|
Elevation Axis of the K1 Telescope |
Prochaska Ratliff Park Cowley Wold Phillips Nelson |
21SEP15 |
|
Vignetting with K1DM3 at the Cassegrain Focus, with ADC |
Phillips |
29SEP15 |
|
Vignetting with K1DM3 assuming a masked M3 |
Phillips |
29SEP15 |
|
Coating Considerations for the K1DM3 Project |
Prochaska Ratliff Cowley Adkins Cabak Phillips Wold Dahler |
18DEC15 |
|
Manual Control via Paddle Operation |
Sandford |
1FEB16 |
|
Manually Deploying K1DM3 in case of an Actuator Failure |
Ratliff |
18FEB16 |
|
Outer Drum Fitting Alignment |
Prochaska Cabak Ratliff Cowley Phillips Nelson Adkins Tripsas |
3MAR16 |
|
Earthquake Response When Retracted With Compliant Pivot |
Prochaska Ratliff Cabak |
10MAR16 |
|
Axial Puck Proof Test Procedure |
Cabak |
18AUG16 |
|
Axial/Lateral Witness Sample Test Procedure |
Cabak |
24AUG16 |
|
K1DM3 Mirror Assembly Test |
Tripsas, Cabak, Prochaska, Ratliff, Ward, Cowley |
25AUG16 |
|
Axial Puck Pull Test |
Cabak |
5MAY17 |
|
Actuator Load Calculations |
Cabak |
24AUG17 |
|
Evaluating the Design of the Tertiary System |
Nelson |
20Jan14 |
|
Exlar Maximum Motor Torque Calculations |
Ratliff |
- |
|
M1 Box Coolant Test |
Cabak, Peck, & Tripsas |
24Aug17 |
|
Keck Deployable Tertiary: comments on requirements |
Nelson |
11Oct13 |
|
Kinematic Mount for Deployable Tertiary |
Nelson |
6Jan14 |
|
Potential Interferences |
Cabak & Ratliff |
13Dec17 |
|
Tertiary Mirror size, shape and Location |
Nelson |
12Oct13 |
|
Vibration Testing |
Cabak & Peck |
13Dec17 |
|
Tertiary Mirror in Beam Positioning Requirements |
Adkins |
2Oct13 |
|
Integration and Testing Plan |
Prochaska |
11Apr16 |
|
Swing Arm Pivot Pin Loads |
Ratliff & Cabak |
18Apr16 |
|
Characterizing Swing Arm Kinematics |
- |
- |
|
Mirror Handling Plan |
Cabak |
8Jul16 |
|
Mirror Assy Lateral Adjustment HW Analysis |
Cabak |
27Jul18 |
|
Setting Ball Joint Position & Reverse Limit Switch on Exlar Actuator |
Ratliff |
18Aug18 |
|
Setting Limit Switch Positions for Destaco Clamps |
Ratliff |
5Nov18 |
|
Mirror Center Location Fixture Use Procedure |
Cabak |
7MAR18 |
|
Mirror Installation Set-up & Assembly Plan |
Cabak |
4JUN18 |
|
HW Lock Down Specs |
- |
- |
|
Come-along Procedure |
- |
- |
|
Mirror Cleaning Procedure |
- |
- |
|
Absolute Encoder Readhead Replacement Procedure |
Ratliff, Deich, Cabak |
21Feb2019 |