Keck I Deployable Tertiary Mirror - Technical Notes



TechNote #

Description

Author

Date

872-LTN0000

Documentation Table of Contents

-

-

872-LTN1002

Tertiary Mirror Size

-

-

872-LTN1003

Coordinate Systems for the K1DM3 Project

Prochaska Phillips Adkins

15DEC13

872-LTN1004

Finite Element Analysis for the Mirror Mounts for the K1DM3 Project

Cabak Nelson Prochaska

30JAN14

872-LTN1005

Positioning of M3 for the K1DM3 Project

Prochaska Adkins Nelson Phillips

25AUG14

872-LTN1006-D

Mirror Specifications for the K1DM3 Project

Prochaska Nelson Epps Hilliard Phillips Adkins

2SEP14

872-LTN1007

Tertiary Kinematic Mounts

Nelson

21SEP14

872-LTN1008

Damper Concept and Trade Discussion

Prochaska Ratliff Cowley Cabak Nelson

19DEC14

872-LTN1009

Random Vibration Analysis

Prochaska Cabak Nelson

29JAN15

872-LTN1010

Prototype for the K1DM3 Project

Prochaska Ratliff Cowley Adkins Cabak

9MAR15

872-LTN1011

Zygo Quote for the K1DM3 Mirror

Prochaska Cabak Ratliff Cowley Phillips Nelson Adkins

16SEP15

872-LTN1012

Elevation Axis of the K1 Telescope

Prochaska Ratliff Park Cowley Wold Phillips Nelson

21SEP15

872-LTN1013

Vignetting with K1DM3 at the Cassegrain Focus, with ADC

Phillips

29SEP15

872-LTN1014

Vignetting with K1DM3 assuming a masked M3

Phillips

29SEP15

872-LTN1015

Coating Considerations for the K1DM3 Project

Prochaska Ratliff Cowley Adkins Cabak Phillips Wold Dahler

18DEC15

872-LTN1016

Manual Control via Paddle Operation

Sandford

1FEB16

872-LTN1017

Manually Deploying K1DM3 in case of an Actuator Failure

Ratliff

18FEB16

872-LTN1018

Outer Drum Fitting Alignment

Prochaska Cabak Ratliff Cowley Phillips Nelson Adkins Tripsas

3MAR16

872-LTN1019

Earthquake Response When Retracted With Compliant Pivot

Prochaska Ratliff Cabak

10MAR16

872-LTN1020

Axial Puck Proof Test Procedure

Cabak

18AUG16

872-LTN1021-C

Axial/Lateral Witness Sample Test Procedure

Cabak

24AUG16

872-LTN1022

K1DM3 Mirror Assembly Test

Tripsas, Cabak, Prochaska, Ratliff, Ward, Cowley

25AUG16

872-LTN1023

Axial Puck Pull Test

Cabak

5MAY17

872-LTN1024

Actuator Load Calculations

Cabak

24AUG17

872-LTN1025

Evaluating the Design of the Tertiary System

Nelson

20Jan14

872-LTN1026

Exlar Maximum Motor Torque Calculations

Ratliff

-

872-LTN1027

M1 Box Coolant Test

Cabak, Peck, & Tripsas

24Aug17

872-LTN1028

Keck Deployable Tertiary: comments on requirements

Nelson

11Oct13

872-LTN1029

Kinematic Mount for Deployable Tertiary

Nelson

6Jan14

872-LTN1030

Potential Interferences

Cabak & Ratliff

13Dec17

872-LTN1031

Tertiary Mirror size, shape and Location

Nelson

12Oct13

872-LTN1032

Vibration Testing

Cabak & Peck

13Dec17

872-LTN1033

Tertiary Mirror in Beam Positioning Requirements

Adkins

2Oct13

872-LTN1034

Integration and Testing Plan

Prochaska

11Apr16

872-LTN1035-B

Swing Arm Pivot Pin Loads

Ratliff & Cabak

18Apr16

872-LTN1036

Characterizing Swing Arm Kinematics

-

-

872-LTN1037

Mirror Handling Plan

Cabak

8Jul16

872-LTN1038

Mirror Assy Lateral Adjustment HW Analysis

Cabak

27Jul18

872-LTH1039

Setting Ball Joint Position & Reverse Limit Switch on Exlar Actuator

Ratliff

18Aug18

872-LTN1040

Setting Limit Switch Positions for Destaco Clamps

Ratliff

5Nov18

832-LTN2001

Mirror Center Location Fixture Use Procedure

Cabak

7MAR18

872-LTN2002

Mirror Installation Set-up & Assembly Plan

Cabak

4JUN18

872-LTN2003

HW Lock Down Specs

-

-

872-LTN2004

Come-along Procedure

-

-

872-LTN2005

Mirror Cleaning Procedure

-

-

872-LTN2006

Absolute Encoder Readhead Replacement Procedure

Ratliff, Deich, Cabak

21Feb2019